Blister
Well-Known Member
http://www.thebaynet.com/articles/0219/acresofhardwoodtreesinjeopardyoverlocalsolarproject.html
Why can't panels be mounted on existing High Voltage transmission towers or on the "right of ways" that are already clear cut and maintained by the utilities? Md. has hundreds of miles of transmission lines, underground pipelines, and thousands of miles of divided highways with median strips. All of this land is unused, has to be kept cleared, and close to ties to the existing grid?
Why can't panels be mounted on existing High Voltage transmission towers or on the "right of ways" that are already clear cut and maintained by the utilities? Md. has hundreds of miles of transmission lines, underground pipelines, and thousands of miles of divided highways with median strips. All of this land is unused, has to be kept cleared, and close to ties to the existing grid?