glhs837
Power with Control
Check my math, but those appears to work out to 200K per STALL!!!! Not station, but each individual charging point will cost 200K.
https://www.ajot.com/news/us-offers-evgo-conditional-1.05-billion-loan-for-ev-chargers.
Oh, wait, each charger will charge two cars, so that's 14,000. So only one hundred thousand dollars per charging point. So what EVgo needs to charge for the charge from these will be crazy high. And 40% them will be in "disadvantaged" areas. Where I'm sure the disadvantaged people will love paying more for jiuce than they would for gas.
This is why govt needs to keep its hands out of it. This loam will never be paid back, and the equipment will be destroyed. What mutilfamily units need is solid inexpensive level 2 charging.
Meanwhile, Tesla pays about 30K to install each charger.
https://www.ajot.com/news/us-offers-evgo-conditional-1.05-billion-loan-for-ev-chargers.
Oh, wait, each charger will charge two cars, so that's 14,000. So only one hundred thousand dollars per charging point. So what EVgo needs to charge for the charge from these will be crazy high. And 40% them will be in "disadvantaged" areas. Where I'm sure the disadvantaged people will love paying more for jiuce than they would for gas.
This is why govt needs to keep its hands out of it. This loam will never be paid back, and the equipment will be destroyed. What mutilfamily units need is solid inexpensive level 2 charging.
Meanwhile, Tesla pays about 30K to install each charger.