I noted on the sign of the Hughesville Solar Farm that the 20 acres of solar panels will produce a peak of 5.5 MW of power.
Being in the power-producing business. I had to laff...but not of the "ha ha" variety,
A 5.5 MW LNG-turbine generator would take up about one-tenth of one acre...and produce 5.5 MW 24 hours a day, 7 days a week, where that pile of wasted taxpayer dollars will have an average output of around 1 to 1.5 MW...accounting for night and cloudy days. This insanity better end soon.