I have an integrated program master schedule that has 5 separate schedules integrated into the master. There are internal links within the schedule and external links between schedules within the master schedule. Somehow I have created a circular relationship within this master schedule. The circular relationship has to be contained in one of the external project links because like excel if you create a circular link within a file, it throws an error. This error is preventing us from recalculating the schedule which we critically need to do.
Can anyone provide any advice or tips for trouble shooting this problem?