glhs837
Power with Control
Time lapse. These arms incorporate changes based on lesson learned from Tower 1. And the first one built at the Cape is all stop until they get more launches and catches at Boca. I'll note that this one like the previous one, uses a oil rig draw works to run the giant cable that lifts and lowers the arms, and absorbs the +200tons of booster settling back after the catch.