Any builders out there.
I have my new home permit on hold for this: "On hold, engineered erosion and sediment control plan required since the proposed disturbance is within the 100 ft critical area buffer" from SOIL CONSERVATION DIST input to my permit.
Any recommendations? What do I do? Wait? Or what?
Some data: Replacing existing house, in buffer 1080 sqft, with one that only 999 sq ft in buffer.
No tree's removed, or any other dig out side existing house outline.
I have my new home permit on hold for this: "On hold, engineered erosion and sediment control plan required since the proposed disturbance is within the 100 ft critical area buffer" from SOIL CONSERVATION DIST input to my permit.
Any recommendations? What do I do? Wait? Or what?
Some data: Replacing existing house, in buffer 1080 sqft, with one that only 999 sq ft in buffer.
No tree's removed, or any other dig out side existing house outline.