dgates80 said:Anybody have any idea what is the deal with the series of covered up signs on southbound 2/4 leading up the the Solomons bridge? Is there some sort of multi-day bridge work planned soon or something?
Makes me want to stop and take a peek!
When are they finishing that? All I can see is the beginning of it at Patuxent High School. Didn't realize it was going out to rt 4. Thought they'd stop at old 4.MMDad said:That's where the new Lusby connector road will be.
Vince said:When are they finishing that? All I can see is the beginning of it at Patuxent High School. Didn't realize it was going out to rt 4. Thought they'd stop at old 4.
Dye Tied said:From the Emptyprise
Beginning Sunday night, Sept. 9, the State Highway Administration will replace six aluminum joints on the bridge connecting Calvert and St. Mary’s counties.
Jameo said:Here we go again![]()