Covered-up signs on 2/4 Southbound

dgates80

Land of the lost
Anybody have any idea what is the deal with the series of covered up signs on southbound 2/4 leading up the the Solomons bridge? Is there some sort of multi-day bridge work planned soon or something?

Makes me want to stop and take a peek!
 

MMDad

Lem Putt
dgates80 said:
Anybody have any idea what is the deal with the series of covered up signs on southbound 2/4 leading up the the Solomons bridge? Is there some sort of multi-day bridge work planned soon or something?

Makes me want to stop and take a peek!

That's where the new Lusby connector road will be.
 

Vince

......
MMDad said:
That's where the new Lusby connector road will be.
When are they finishing that? All I can see is the beginning of it at Patuxent High School. Didn't realize it was going out to rt 4. Thought they'd stop at old 4.
 

MMDad

Lem Putt
Vince said:
When are they finishing that? All I can see is the beginning of it at Patuxent High School. Didn't realize it was going out to rt 4. Thought they'd stop at old 4.

The state portion, which is Rt. 4 to 765, is scheduled to be complete Fall '08. I don't know what the county schedule looks like.
 

Dye Tied

Garden Variety Gnome
From the Emptyprise

Beginning Sunday night, Sept. 9, the State Highway Administration will replace six aluminum joints on the bridge connecting Calvert and St. Mary’s counties.
 

Jameo

What?!
Dye Tied said:
From the Emptyprise

Beginning Sunday night, Sept. 9, the State Highway Administration will replace six aluminum joints on the bridge connecting Calvert and St. Mary’s counties.

Here we go again :jameo:
 