Just checked a little of 7" in PF
Looks like we got about 4 inches near base.
Just checked a little of 7" in PF
Ugh... mix of snow and rain here in Tall Timbers.
Shoveled off deck and walkway, driveway has thin layer of slush, waiting til about noon to start the snowthrower, wondering how steep the learning curve is since this is the 1st time using it.
Using a snowthrower/snowblower in slush sucks. It get clogged up very quickly.
only about a quarter inch of slush topped by 7 inches of snow..skid set at an inch so it shouldn't be a problem..but will have to scrape off or salt slush so it doesn't freeze overnight I think.
Using a snowthrower/snowblower in slush sucks. It get clogged up very quickly.
We have a couple inches on the driveway and turning into slush.
I think it would be better for us to not do any clearing on the driveway.
If I clean it will become a sheet of ice. The current snow/slush will provide some traction.
Cleared mine, ended up melting down to nothing so my driveway is now clear.
Fluid Film and it should solve that problem.
Never heard of fluid film.
Is it next to the blinker and headlight fluid?
Thanks. I will have to try it.
Spray the shoot and drum with Fluid Film and it should solve that problem.