Don't want to pull it?
The engines?...Plan is to set up and pull, rebuild and re-install both mains and the genset. Fortunately, the marina already has lifting frames we can modify to suit our vessel. Have to remove the entire main cabin aft bulkhead first...then set up the lift frame and any load spreading timbers over a main engine. Chain fall the 1450 pound monster up out of it's hole and slide it back in the aft cockpit so that it can be picked with shore-based crane and set on a trailer. Repeat process for second main engine. Figure the entire "engines out" operations will require three men and take about three-four days.